Facilities Management

St Austell Brewery reports a 49% drop in total waste since 2023 after standardizing bins, training staff and auditing results across its 45 managed pubs.

EPA pushed stricter refrigerant limits for new supermarket and cold-storage systems to 2032, yet interim caps, California rules and the HFC phasedown remain.

New building retrofits starting construction after June 30, 2026 cannot claim Section 179D, so facilities teams need to rebuild 2027 cases on operating savings.

U.S. manufacturing growth is driving hazardous waste demand. A new study estimates billions in economic losses if treatment capacity fails to keep pace.

EIA expects gas storage 5% above average entering winter, giving executives time to test energy offers against the budget variance their business can carry.

EnerVenue is scaling battery production in China. Its 30-year nickel-hydrogen technology promises lower lifetime costs, but commercial performance remains unproven.

As wind and solar equipment ages, an established grid connection can make a project attractive for repowering, though permits still need full review.

EPA is nearing a PFAS discharge rule for chemical makers while pushing its metal-finishing PFAS rule to February 2027, and platers should track both.

PJM has asked FERC to approve curtailment-first service for new large loads, and facilities leaders need to price that operating commitment before connecting.

A temporary 500 MW transformer could give Rotterdam port companies earlier grid access, but capacity, eligibility and connection dates remain unconfirmed.

A North Carolina High School's remote-learning day follows weeks of mold closures, rising costs and unresolved questions about district HVAC and humidity oversight.

Emerson plans Qatar's first certified flow-calibration laboratory as LNG expansion increases demand for local automation and maintenance services.

California and Texas are tying data center growth to power, water and infrastructure costs as states impose tough new requirements on large loads.

A utility line strike can trigger far more than repair costs. CGA estimates underground utility damage costs the U.S. economy $83.2 billion per year nationwide.

Did you know that OSHA's public 2025 injury and illness data lets outsiders examine workplace records by site?

AI workloads are pushing rack power to new extremes. That shift is making 800V DC a bigger part of data center design, cost and infrastructure planning.

New Army systems can transport 9,000 gallons of fuel, test fuel quality in the field and improve digital supply visibility as military logistics modernize.

Utilities plan record grid spending through 2030, but Illinois and Michigan cases show regulators testing project evidence before it reaches customer bills.

Kikkoman chose Jefferson, Wisconsin over 63 other Midwest sites largely for water quality, but its opening does not disclose the plant's own water use.

Companies disclosed $339 billion in water-related risk through CDP, but only 5% have set an internal water price, a gap that is starting to close.

1 | 2 | 3 | 4 | 5 | 6 | 7 … 39 | Next »
Currently viewing stories posted within the past 2 years.
For all older stories, please use our advanced search.
Environment + Energy Leader